Project Status: Pre-FID / Front-End Engineering

ADVANCING
GAS AUTONOMY

IMINA Clean Energy and Gas Processing Ltd. is developing a 50 MMSCFD cryogenic gas processing facility in Ologbo, Edo State — bridging Nigerian resources and sustainable domestic energy demand.

50MMSCFD Capacity
96%Propane Recovery
Aerial view of a cryogenic gas processing plant at dusk in a forested landscapeFig. 1 — Indicative facility rendering, Ologbo site

The Ologbo Hub

06° 03' 02" N | 05° 40' 05" E

01. Cryogenic Separation

LPG & NGL Recovery

Deep-cut turbo-expander technology maximises liquid extraction from rich associated gas, targeting 96%+ propane recovery across the single 50 MMSCFD train.

Frosted cryogenic valves and steel process piping
02. Domestic Impact

Lean Gas Supply

Pipeline-quality residue gas delivered to industrial clusters across Edo State and into the national grid via the Escravos-Lagos interconnect.

Gas-fired power station and transmission towers lit at night
03. Clean Energy

Flare Reduction

Monetising associated gas from neighbouring fields removes routine flaring at source, aligning the project with Nigeria's Decade of Gas commitments.

A single clean industrial vent stack against a clear blue sky
DWG-IMN-PFD-001 / Rev. BSimplified Process Flow — 50 MMSCFD Train
  1. 01

    Inlet Slug Catcher

    V-101
  2. 02

    Amine + TEG Dehydration

    U-201
  3. 03

    Molecular Sieve & Hg Guard

    U-301
  4. 04

    Turbo-Expander Cold Box

    K-401
  5. 05

    De-ethanizer / Fractionation

    T-501
  6. 06

    LPG · NGL Storage

    S-601
Inlet: 50.0 MMSCFD @ 1,050 psigCold box duty: −95 °CResidue gas: 44 MMSCFD

Product Off-take Slate

Design-case yields, single train

LPG (Propane / Butane)

Domestic cooking & autogas grade

≈ 340 MT / Day

Natural Gas Liquids

Condensate for regional refining

≈ 1,900 BBL / Day

Lean Residue Gas

Pipeline quality, industrial & power

44 MMSCFD